Skip to content

Detached garages in Virginia

Your garage. Your space. Made simple.

Room for your vehicles, your projects, and everything that needs a place. Pick a model, see what it starts at, and tell us where you're building.

Explore Garages
  • From $29,995
  • Site prep + concrete included
  • Harrisonburg + Richmond
  • Licensed & insured in Virginia

01 / How this works

Three steps from idea to site visit.

  1. Step 1: Pick your model.

    Start from a model and the size you need, then choose your options.

  2. Step 2: See your price.

    Every model shows where its price starts, with site prep and concrete included.

  3. Step 3: Book your site visit.

    We come out to your property and confirm the details before you commit.

02 / The models

Find the right fit.

Pick the number of bays, then the build type. Every model shows where its price starts, with site prep and concrete included.

Bays
Build type

3 models · 2-car · All types

Model name pending

Provisional
Type
Post-frame
Size
Dimensions pending
Bays
Bays pending
From
Starting price pending

Model name pending

Provisional
Type
Stick-built
Size
Dimensions pending
Bays
Bays pending
From
Starting price pending

Model name pending

Provisional
Type
Carport
Size
Dimensions pending
Bays
Bays pending
From
Starting price pending

Model names, sizes and starting prices are being finalized. Each provisional slot shows where those details will go.

03 / Not sure which one

Three questions point you to a size and a build type.

Garage Finder · 1 of 3

What does it need to hold?

04 / What's included

Know what you're pricing.

Starting at $29,995, site prep and concrete included. Those two come first on the list below.

  • Site prep
  • Concrete
  • Permit process, handled for you
  • Design
  • Wood framing with engineered roof trussesPost-frame
  • Metal siding and roofingPost-frame
  • Trades coordination
  • Final grade

What's not included

  • Vinyl, HardiePlank or stone veneer siding: quoted on request
  • The rest of this list is being confirmedList pending

05 / By the numbers

Garages, counties, years.

Garages built
Figure pending
Counties served
Figure pending
Years in business
Figure pending

06 / Where we build

Where we build.

Offices in Harrisonburg and Richmond. Pick a county or city to see where it stands.

Virginia · counties and cities

Map loads as you scroll

  • Home base
  • Counties we serve

Every other county and city: ask about your location.

07 / Recent builds

See what's possible.

  • Rockingham County2-car detached, attic truss24 × 24
  • Highland CountyPost-frame40 × 40 × 12
  • Loudoun County3-car detached26 × 36

08 / How it works

From first call to final walkthrough.

Depending on your county's permit lead time, you could be moving in as soon as 6 to 7 weeks after you order.

  1. Stage 1: Request your price

    Tell us your county, the model you're after and how to reach you.

    Timeline

    About a minute

  2. Stage 2: Site visit

    We come out to see the property before we price it.

    Timeline

    Timeline pending
  3. Stage 3: Design and quote

    We price the model and the options you picked.

    Timeline

    Timeline pending
  4. Stage 4: Permits

    We handle the permit process with your county.

    Timeline

    2 to 6 weeks, depending on the county

  5. Stage 5: Site prep, concrete and build

    Construction starts 1 to 2 weeks after permits are issued.

    Timeline

    4 to 5 weeks on site

  6. Stage 6: Final grade and walkthrough

    We finish the grade and walk the building with you.

    Timeline

    Timeline pending

09 / What people say

Hear from the people we've built for.

5.0 average · 40+ Google reviews

  • “Even with the change orders, they came within $150 of the price I was quoted.”

    Joshua Allison5.0 · Google
  • “Working with Douglas and William was a pleasure, from design to completion.”

    Thomas Beck5.0 · Google
  • “They were quick to come 2 hours away to give me a quote.”

    Nicholas Lanciault5.0 · Google

10 / Price My Garage

Let's talk about your garage.

Tell us where you are building and what you have in mind. It takes about a minute.

Size, use, timing, anything we should know.

We'll review your details and contact you about the next step.

11 / Questions

Start with better answers.

Who handles the permits?

We do. We handle the permit process with your county. Approval usually takes 2 to 6 weeks, depending on the county.

How long does a garage take?

Construction can start a week or two after permits are issued, and we aim to finish within 4 to 5 weeks of starting. Depending on your county's permit lead time, you could be moving in as soon as 6 to 7 weeks after you order.

Is site prep included?

Yes. Site prep and concrete are included in the starting price of $29,995. We handle the job from site prep to final grade.

What's not included?

Vinyl, HardiePlank or stone veneer siding is quoted on request. The full list is being confirmed.

Answer pending
Do you offer financing?
Answer pendingAsk us in your price request or call (540) 324-8861.
What warranty comes with the garage?
Answer pendingAsk us in your price request or call (540) 324-8861.